| IGA TECH INDUSTRIAL ELECTRONICS PVT. LIMITED., - DIRECTORS PROFILE | ||||||||||
| Sl No. | Name | Address in India | Qualification | Date of Birth | Professional Experience | Desired Activity in the Company | ||||
| Field & Type of Work | Products Dealt with | Position | Company | Period | ||||||
| 1 | Mr. Thomas Joseph | Enchackattu House, Puthuppally.P .O., Kottayam. PIN-686 011, Kerala. Tel: 0091 481 464644. | B.Sc Engg (Mechanical 2nd Rank), M.S.M.E (US), MBA (US). | October 8, 1956 | Mechanical Engineering for Ammonia, Urea, and Complex Fertilizer plant support projects. | Pressure Vessels, Rotating Equipment, Piping Systems, Heat Exchangers | Technical Services Engineer, Assistant Manager Engineering | FACT Cochin Division, Ambalamedu, Cochin | 1979 to 1985 | Any suitable role for the well being of the Company. |
| Design and Development of electro-mechanical equipment for Biotechnology industry | Bioreactors, Water bath heaters, Magnetic shaker platforms | Mechanical Engineer, | Bellco Biotechnology, Vineland, New Jersey, USA | 1985 to 1988 | ||||||
| Design and Development of electro-mechanical equipment for Biotechnology and Fibre Optic industry | Chromatography columns, Fibre Optic couplers, Metering devices | Manager Engineering | Owens-Illinois, Vineland, New Jersey, USA | 1988 to 1991 | ||||||
| Design and Development of Cryogenic equipment, Electronic specialty gases production equipment, Air Separation plant equipment | liquid Helium and Hydrogen starage and handling, Super conducting magnets, Flourine and NF3 process, ASU plants | Principal Engineer, Engineering Manager | Air Products and Chemicals, Inc. Allentown, Pennsylvania, USA | Since 1991 | ||||||
| 2 | Dr. Tomy Sebastian | Kuriath House, Edanadu P.O., Arunapuram (via), Kottayam, Kerala - 686 574 | B.Sc Engg (Electrical - 1st Rank), MS (Power Electronics - IIT Madras), MASc (Power Electronics - Univ. of Toronto), Ph. D. (Electric Machines and Drives - Univ. of Toronto). | May 29, 1957 | Power Electronics: Testing, Commissioning, Design & Development. | UPS upto 500kVA, DC systems upto 2000A & AC Drive upto 400kW. | Trainee Engineer. | KELTRON, Trvivandrum | 1979 to 1980 | Any suitable role for the well being of the Company. |
| Power electronics, Research & Applied technology division. | Motor drives, Power supply, and battery chargers. | Sr. Project Engineer | Black & Decker Corp., Baltimore, Maryland, USA | 1987 to 1992 | ||||||
| Automotive steering systems, Electric Machines, and Drives | Brushless motors and drives for steering application. | Technical Director, Advanced Motors | DELPHI Automotiove systems, Saginaw, Michigan, USA | Since 1992 | ||||||
| 3 | Mr. Peter Benedict | Nedumpurath house, Asamanoor PO, Kuruppampady Via, Ernakulam Dist-68 35 49 Tel 484- 658345 | BSc(Engg) Electrical | March 20,1953 | Electrical maintenance for textile mill Equipment | Tfrs, Switchboards, MCC, Motors, Boiler equipment | Maintenance Engineer | Kerala Spinners Ltd, A Birla Group CO, Kerala. | 1976-1978 | Director - Business Development. However, any other position as appropriate is acceptable. |
| Preparation of tenders, negotiation & execution of projects | Sub station equipment, factory installations | Contracts Engineer | Hind Electric & Engg Corpn, Bombay. | 1978-1980 | ||||||
| Tender Negotiation & Project execution | Power supply equipment, Hanger lighting & Generating plants | Technical Officer | AIR INDIA, Bombay. | 1980-1986 | ||||||
| Project Management | MV/LV Distribution equipment & low current equipment | Project Manager (Electrical) | Arabian Co. for Int Projects, Riyadh. | 1986-1988 | ||||||
| Project Management starting from finalization of conceptual design | MV/LV Distribution equipment & low current systems | Chief Electro-Mech Engineer | SHARACO, Riyadh. | 1988-1996 | ||||||
| Project execution from start to delivery of equipment, co- ordination with various dept foreign suppliers etc. | MV /LV equipment Mfd by Schneider Electric | Project Manager | Schneider Electric. K.S.A | 1996 onwards | ||||||
| 4 | Mr. C. M. Varughese | T C -13/336, Chakkittamuriyil house, Pattor, P. O. Kunnukuzy, Thiruvanathapuram. PIN-695037. Tel: 0091 471 448 348. | B.Sc Engg (Electrical), MBA, SMIEEE. | November 3, 1955 | Power Electronics: Testing, Commissioning, Design & Development. | UPS upto 500kVA, DC systems upto 2000A & AC Drive upto 400kW. | Trainee Engineer to Engg Department Manager. | KELTRON, Trvivandrum | 1979 to 1996 | Technical Director. |
| L. V. Activity: LV Design | Switchboards, ATS's, MCC's, Drives, Soft Starters, PF Controllers, etc | LV Design Manager, Managing Director | Schneider Electric, KSA. IGATECHIndustrial Electronics Pvt ltd., Cochin. | November 1996 to July 2001 Since July 2001 | ||||||
| 5 | Mr. K. P. Prajeeth | Kurumkulam House, Near Nirmala College, Thrissur-680 004, Kerala. Tel: 0091 487 361 059. | B. Tech (Electrical) | May 24, 1967 | Turn Key Projects: Monitoring of site work & Procurement of shortage items towards the completion of project. | 11kv / 25kv Substation equipment - Transformers, Circuit Breakers, Isolators, Relay Panels, etc | Project Engineer | Chowgule & Co. Ltd, Bombay. | 1989 to 1991 | "Commercial Director" or "Industrial Director". |
| Turn Key Projects: Tendering & Execution of HV Substations upto 110kV and Complete Industrial Electrification. | Substation equipment, Lighting eqpt, High Masts, PLC, SCADA system, etc | Executive - Electrical Contracts. | Parry Engg & Exports Ltd, Madras. | 1991 to 1992 | ||||||
| 132/33/13.8kV S/S & 33kV Distribution Projects: Tender evaluation, Engg approvals and Monitoring on the progress of execution by the Contractors. | Substation and Distribution equipment. | Project Engineer | SCECO, KSA. | 1992 to 1996 | ||||||
| Projects Management: Order Execution of MV & LV Switchgears from the Order to Delivery - Coordination between all the internal depts. and Customer. | Schneider range of MV, LV & Automation products. | Project Manager. | Schneider Electric, KSA. | Since 1996 | ||||||
| 6 | Mr. M. K. Vikram | No. 10, 3rd Cross Road, N R Colony, Bangalore PIN-560 019. Tel: 0091 80 661 4746. | BE Electrical | March 16, 1952 | HV / MV Substations - Testing & Commissioning. | Sub Station Equipment of ABB, MG,..etc makes | Asst. Engineer | Karnataka Electricity Board. | 1974 - 1988 | After Sales Services & Branch Operations. |
| Testing & Commissioning of 132kV GIS Substation. Operation & Maintenance of Diesel Power Station. | Sub Station / Power Station Equipment of ABB, MG, GE..etc makes. | Protection Engineer. | Oman National Electric Co. | 1988 - 1992 | ||||||
| Erection, Testing & Commissioning of 132kV GIS S/S, 33kV & 13.8kV S/S. | Sub Station Equipment of MG, GEC Relays..etc. | Manager - Site Services. | Schneider Electric, KSA. | 1992 - 1997. | ||||||
| Manufacturing of MV & LV Swgrs, Relay Panels, etc. | MV / LV Breakers, relays, Contactors, Drives, Soft Starters, etc of Schneider make - Both ANSI & IEC. | Manager - Plant A. | Schneider Electric, KSA. | Since 1997 | ||||||
| 7 | Mr. Baramy.V.Jahafar | Anas Villa, Manari Road, Panniyankara, Calicut, Kerala 673 003. Tel: 0091 495 320 437 / 320 798. | B. Commerce, L.L.B. (not completed) | May 18, 1961 | Worked as an accountant, Cashier, Purchaser, Tally clerk, etc.. | Transport business, Timber and other trading, Saw Mills, Construction fields, etc.. | Owner - Family Business. | Quick way transport, Latex India, Baramco, Baramy Constructions India Pvt. Ltd. | 1973 - 85 (School & College going time - part time work in Family business) | Any suitable role for the well being of the Company. |
| Book-keeping, weekly bank reconciliation, Receivable follow-up, Salary and admin. Supervision, Preparation of final accounts, Report to Parent company, etc.. | L/C Export / Import, Tax returns, Set-up the new financial package - SCALA. | Accounts Manager | Schneider Electric, KSA. | Since1985 (with 2 year break in '88 & '89) till May 2001 | ||||||